A fleet branding rollout plan that keeps vehicles working
A good fleet branding rollout plan has five phases: audit the fleet, design per vehicle model, brand one trial vehicle, install the rest in batches after working hours, then hand over with a written warranty. Done this way, a fleet of dozens of vehicles can be branded in weeks without stopping operations.
The problem: branding postponed because the fleet cannot stop
Most operations managers agree that branded vehicles help. What stops them is the fear of pulling vehicles off the road. And if the stickers fail within 8–12 months, as many do in Riyadh, the disruption repeats every year.
The five phases
- Audit. List vehicles by model and year, note how long each will stay in service, and flag recent paintwork.
- Design per model. One approved layout for each model, so every vehicle of that type is identical.
- Trial vehicle. We can brand one vehicle at a 50% discount so you see the result first.
- Batches after hours. Installation at your site, in the evenings and on weekends, a few vehicles at a time.
- Handover. Written warranty in the quotation: 30 months on 3M, 16 on ORAFOL, against burning and peeling.
Matching material to service life
| Vehicle stays in service | Material | Rated life |
|---|---|---|
| Several years | Original 3M | Up to 5 years |
| Up to about 3 years, or lower budget | Original ORAFOL | Up to 3 years |

Talk to us. Send us your vehicle count and how long they will stay in service, and we will send a 5-year cost comparison based on your own fleet numbers.
From preparation to delivery: how we brand a fleet · Al Omari Agency on YouTube
A rollout in practice
Domino’s Pizza (Al Amar company) needed 55 refrigerated trucks branded in Riyadh. A previous supplier’s “protective layer” stickers had burned in less than a year. We rolled out the whole fleet with ORAFOL in less than a month, in batches, without stopping deliveries. After 14 months: zero burning, zero peeling.
Frequently asked questions
How long does a rollout take?
It depends on fleet size and batch schedule. Each vehicle needs one working day, once.
What if we add vehicles later?
The approved design per model is kept, so new vehicles match the existing fleet.